Laura Secord School

New gym addition for this elementary school provides a new gymnasium, associated support facilities and a fully equipped grooming room to this Wolseley community landmark. 

Cecil Rhodes School

Moving a large cooling tower from the roof to allow for a new roof to be installed, after which we re-installed the old unit with a new custom stand that we fabricated in our shop. 

283 Banatyne

Office building conversion to condominiums, each suite contains its own mechanical. The entire drainage, water piping and ventilation systems were all replaced.

444 Kennedy

Manitoba housing project which required the supply and installation of a HRV (Heat Recovery Ventilator) duct distribution and new plumbing fixtures throughout

A & B Mechanical

Head office for A & B. There was a complete redevelopment of the property in 2009 with the addition of a further 4000 sq. ft. The project called for multiple zones of infloor heat, duct distribution and hydronic heating. The photo’s are taken in the mechanical room showing the high efficient boiler servicing multiple heating zones.

Bell Hotel

The project was to redevelop a 100 year old hotel that had been vacant for 5 years and turn it into a assisted living complex. The entire existing mechanical system was removed and an updated hydronic/chilled water system was installed. All new water, drains and vent lines were installed as well as new plumbing fixtures. We installed 2 high efficient hydronic boilers to provide for the heat and a separate boiler to meet the domestic hot water demands. A 53 ton chiller was installed on the roof to provide the required cooling demand.

Polo Park

The photos show various food kiosks in the food court area where we installed complete mechanicals. The challenge on these was the restricted space that was allowed for the mechanical equipment to be installed in.

Portage La Prairie

We completed two projects in Portage La Prairie. The one project was a complete mechanical for a regional office for the accounting firm of MNP. The second project was far more difficult, the complete mechanical for an automotive shop at Portage Collegiate Institute. The project was an addition to the original school and all new systems had to be integrated with the existing mechanical systems.

Post Office

This project was completed in the spring of 2011. The project was the first project that we undertook that dealt with Leeds Certification.

Makoonsag Intergenerational Children’s Centre Inc.

Project completed Fall 2011. This project was a complete retrofit of an existing building, This building was also LEEDS Certification project. The HVAC component was a Mitsubishi Heat Pump Multi Zone system which provided 8 individual control zones.

East Elmwood Community Centre

10,000 Square foot New Community Centre. Completed all Mechanical installations.

370 Donald Street

100 Year old Office building renovated to 39 suite apartment building complete with Commercial space in basement.

 

Porsche Centre Winnipeg

Renovated existing building to accommodate new car dealership.

 

Shawarma Khan McDermot Avenue & Pembina Hwy

Renovated both spaces to accommodate new restaurant. McDermot space presented a challenge to the MUA install

as we could not vent space to the roof. Supply and Installed new enviro system which filtered exhaust air so we could

discharge air out the side of the building.